Read the Case Study
CALL US TO DISCUSS YOUR PROJECT TODAY! + 1 800 422 2525
Problem
A major international oil company with large Benelux presence approached OPW looking for a reliable long-lasting containment system for a new build filling station, including Fibrelite chambers and KPS piping. Fast installation with minimal maintenance was a priority in this project.
Solution
In the installation, the oil company used the Fibrelite S14-390-D400 chamber system and KPS piping. The chamber extensions were laminated at the factory before dispatch, reducing the onsite installation time which was a priority. Even with the extensions they are fully vacuum testable and watertight.
KPS piping provides a safe, easy-install solution requiring the minimum possible number of welds. KPS double wall piping requires fewer welds than any other system available, as the compact KPS fittings weld both walls of a double wall pipe simultaneously, again reducing installation time.
CALL US TO DISCUSS YOUR PROJECT TODAY! + 1 800 422 2525
Unrivalled Strength-to-Weight
The Ultimate in Composite Engineering