Read the Case Study
Project Overview
An Atlanta based engineering firm asked Fibrelite to solve a problem for the CDC location in Atlanta Ga. The facility has a new diesel fueling facility where vehicles are fueled. They wanted to have easy access to their overspill vault set across the street from the loading facility.
Heavy duty trench on the street allows street traffic to drive over and offers a low weight solution to the Center of Disease Control’s complex needs. Fibrelite’s range of heavy duty covers was designed for such an application. The main requirement for access the containment vault were met.
CALL US TO DISCUSS YOUR PROJECT TODAY! + 1 800 422 2525
Unrivalled Strength-to-Weight
The Ultimate in Composite Engineering