Problem
Removing the previously installed covers was time consuming due to the covers’ weight (approximately 100kg). A specialised tripod was needed to lift the covers, which was both costly and time consuming. Because the covers were situated on a well used road it was essential to minimise maintenance time and subsequent disruption to traffic.
Solution
In the installation, the oil company used the Fibrelite S14-390-D400 chamber system and KPS piping. The chamber extensions were laminated at the factory before dispatch, reducing the onsite installation time which was a priority. Even with the extensions they are fully vacuum testable and watertight.
KPS piping provides a safe, easy-install solution requiring the minimum possible number of welds. KPS double wall piping requires fewer welds than any other system available, as the compact KPS fittings weld both walls of a double wall pipe simultaneously, again reducing installation time.
Results
Fibrelite’s trench cover design allows covers to be lifted out without specialised lifting equipment. All Fibrelite trench covers can be easily removed by two people using the Fibrelite FL7 lifting handles.
CALL US TO DISCUSS YOUR PROJECT TODAY! + 1 800 422 2525
Unrivalled Strength-to-Weight
The Ultimate in Composite Engineering